Skip to content
  • Post Free Ads
  • Ads Display
  • Manage Ads
  • Register
  • Post Free Ads
  • Ads Display
  • Manage Ads
  • Register

Transportation Production Line Training System

  • by
  • January 30, 2021January 30, 2021
by zyjago
Published: January 30, 2021 (4 weeks ago)
Category
Advertisement
Buy-Sales
Services

http://www.yalongeducation.com
YL-1633B adopts 1+1 combined structure, and it is composed of 5 stations which are installed on aluminum alloy guide training platform, namely feeding station, processing station, assembly station, double-layer conveying station, sorting station, adding with industrial robot palletizing unit. The electrical layout adopts drawer type, and all electrical controllers are installed on the mesh plate drawer. The separation design of electrical and mechanical is in accordance with the industrial practice condition.

Show Contact Information

  • Privacy Policy
  • Prohibited Items

Neve | Powered by WordPress